Waverley’s First Replacement Boiler
Waverley’s first replacement boiler is prepared for despatch from Babcock Power’s Renfrew Works.
Supporting the preservation and operation of paddle steamers Waverley and Kingswear Castle
Waverley’s first replacement boiler is prepared for despatch from Babcock Power’s Renfrew Works.
A second report on Waverley’s 1981 re-boilering with images previously not shared showing the new boiler being fitted.
Momentous twelve months | Scottish Branch news | Tattershall Castle moved to Kent | Faithful withdrawn | White Swan completes 125 years
‘Unbelievable’ early season | Medway pirates | Humber ferry finale | Kingswear Castle | Prince Ivanhoe | Boob of the month
Bristol Channel news | Maid of the Loch sails on | Prince Ivanhoe | Waverley – New boiler installed | Kingswear Castle back in the water
New boiler project is up to schedule | Prince Ivanhoe sails north | Bristol Channel cruises under the Waverley banner | Kingswear Castle progress report | North of the Border
Recapping Waverley’s 1981 Re-Boilering.